24/7 Emergency Service

Serving all of Massachusetts and New Hampshire

Asbestos Testing in Sterling MA, From Clinton to West Boylston and Surrounding Areas

Home » Massachusetts » Sterling

Asbestos Testing for Sterling Farmhouses, Homes Around the Common and Newer Subdivisions

Asbestos Testing Answers for Sterling Center Houses, Post-War Subdivisions Near the Waushacum Ponds and Farm Buildings by the Wachusett Reservoir, Plus What the Building Department at the Butterick Municipal Building Expects

Asbestos Testing for Sterling Homes, Farms and Town-Centre Buildings

Most people who ask about asbestos testing in Sterling MA start the conversation the same way, by describing a project they have half planned and wondering whether an old floor, pipe or ceiling might contain asbestos. That instinct is a sound one. Sterling stayed a farming town of about 2,000 people for roughly a century and then grew past 8,000 after 1950, so a large share of its houses went up or were remodelled in the decades when asbestos was a routine ingredient in building products.

The first conversation costs nothing, because A&E Environmental offers free estimates in Sterling and can explain what asbestos testing your project needs before you decide anything.

Need Help? We have you covered! Contact Us Now!

Our Client Testimonials

“I did an asbestos inspection for a single family home. Highly recommend A&E. They were timely, professional, and upfront with pricing before the work started. Very kind people and easy to work with. Delivered results in a timely manner! Highly recommend!”
“Owner came by and we walked the job. Very polite and informative. Was also willing to go the extra mile to take care of my issues Crew was on time and very friendly. They worked very hard and cleaned up and had me inspect. I was very impressed and would be the 1st to recommend this company to anyone.”
“We have 3 boilers with a lot of piping that needed to be encapsulated. The asbestos covered all the piping, roughly 6″ in diameter, to the various units in our 3 family. The workman took 2 days to complete the job. Other than a little water on the floor, the complete area was cleaned. A fan running overnight easily dried up all the water. A&E is a very professional company with good communications. I would recommend A&E to anyone needing asbestos heating pipes to be encapsulated.”

Asbestos Testing in Clinton, West Boylston, Princeton, Leominster and Holden

A fair number of Sterling callers also own a rental or a family property in a neighbouring town, and they ask whether the same asbestos testing approach carries over. It does, though the housing changes as you cross each line. Clinton, to the southeast, has a much older housing stock, while West Boylston to the south shares the reservoir shoreline.

To the west, Princeton and Holden rise toward Wachusett Mountain, and Leominster to the north brings city triple-deckers and former industrial buildings into the asbestos picture. Booking one asbestos inspector for properties in two towns is usually simpler than starting the testing over each time.

From a ranch in Sterling to a storefront in Clinton, A&E Environmental carries out asbestos testing in residential and commercial buildings alike.

Asbestos Testing for a Sterling House Built Around 1980

“My house is not that old, so do I really need asbestos testing?” is the most common question on a first call from Sterling. Census figures put the median home in town at around 1980, with roughly 13 percent built before 1940, so plenty of owners assume their house arrived after asbestos had gone. In practice asbestos stayed in flooring, joint compound and ceiling texture into the 1970s, and houses finished around then were often built with stock that had sat in a supplier’s yard for a while.

The other half of the answer is the law. Since a 2014 revision of 310 CMR 7.15, MassDEP expects an asbestos survey before renovation or demolition whatever the age of the building, so even a newer Sterling house needs asbestos testing on the materials a project will disturb. The one exception is an owner-occupant of a single-family home removing non-friable asbestos material personally, and a signed letter from the owner is no substitute for the testing.

What usually settles the testing question is a quick walk through what you plan to change, since a 1980s bathroom with original sheet vinyl and textured ceilings is a very different asbestos testing job from a kitchen gutted to the studs a few years ago.

Knowing how each decade of local housing was put together helps set realistic expectations on that first call, and that knowledge is what a local company like A&E Environmental, working across Sterling and its neighbours, brings to the conversation.

Asbestos Testing Near the Town Common, the Waushacum Ponds and the Wachusett Reservoir Shore

Callers often describe where they live by landmark rather than street, and in Sterling that tells an asbestos inspector a good deal. The town takes in East and West Waushacum Ponds, with Sholan Park and its beach on Lake Waushacum, while the Stillwater River runs through from Princeton toward the Wachusett Reservoir, which forms the boundary with Boylston. The town’s own history notes that this abundance of lakes and streams drew people to the land thousands of years before the first permanent settler arrived in 1720.

Water shaped building here in a quieter way too. According to the town, Sterling lacked enough water power for large industry, so instead of mill blocks it grew as an agricultural community with cottage trades making hats, needles, clocks, chairs and pottery. The legacy for asbestos testing is a mix of farmhouses, barns and outbuildings, a historic centre and, from the 1950s onward, subdivisions filling in the fields between them.

Each of those building types hides asbestos in its own places. Farmhouses tend to carry decades of layered upgrades, barns may have cement panels, and post-war houses often keep original asbestos tile, pipe insulation and ceiling texture, so asbestos testing in town rarely looks the same twice.

Owners who find asbestos in a farmhouse cellar rarely want to start over with a new firm, which is why A&E Environmental keeps asbestos testing and asbestos removal under one company and carries the result straight into a removal plan.

Asbestos Testing Starts With a Walk Through Each Room You Plan to Change

“What will the inspector actually look at?” comes up on nearly every first call. The honest answer is whatever your project will disturb, which is why the asbestos testing visit begins with you describing the work room by room and the inspector listing every surface, pipe and finish in those spaces.

Floors come first in most Sterling houses, because a kitchen or hallway often has two or three generations of vinyl, sheet goods and asbestos adhesive stacked up. Next come walls and ceilings, where joint compound, textured paint, popcorn finish and old plaster all need asbestos testing before any patching or demolition.

In the cellar the testing list grows quickly. Boiler jackets, pipe lagging, elbow fittings, an asbestos cement flue and the asbestos tape on old duct joints all go on the sheet if the work reaches them, while attics bring loose vermiculite and the odd run of wrapped duct.

Outside, the inspector notes siding shingles, roofing, flashing compounds, window glazing putty and caulk. Each material gets its own small sample, sealed and labelled with the room it came from, so the asbestos testing report reads like a map of the house.

Whatever the house, the report should match the real scope rather than the easiest corners to reach, and A&E Environmental’s approach to asbestos testing is designed to cover every suspect material in the work area you describe.

Asbestos Testing on Oil Boilers, Steam Pipes and Old Ductwork

Plenty of first calls from Sterling begin with a heating upgrade rather than a renovation. Owners switching from an oil boiler to a heat pump, or replacing a tired furnace, ask whether the old equipment needs asbestos testing before the installer cuts anything out, and the answer is nearly always yes.

Older boilers were often wrapped in asbestos insulation, and the hot-water or steam pipes leaving them were commonly lagged in asbestos, with a hard asbestos cement at the joints that looks like plaster. The flue connecting the boiler to the chimney may itself be asbestos cement. On forced-air systems, older duct joints were frequently sealed with asbestos tape.

The pieces that catch people out are the hidden runs. Pipes rise through walls to radiators upstairs, and ducts pass through closets and soffits, so asbestos testing should follow every section the heating contractor expects to open, not only the equipment in the cellar.

A positive flue does not have to delay the new heating system, since A&E Environmental’s asbestos boiler flue removal service takes the old cement pipe out ahead of the installer.

Asbestos Testing Under Layered Kitchen and Bath Floors

“Can you just test the top floor?” is a question worth answering carefully, because the top layer is rarely the asbestos problem in an older Sterling kitchen. Lift a laminate or vinyl plank floor and you may find sheet vinyl, then 9-inch asbestos tiles, then a black asbestos mastic holding the stack to the subfloor, and each layer needs its own asbestos testing result.

It is common for the newest layer to test clear while the oldest tile or the mastic beneath it tests positive. Testing only what you can see is the most frequent reason a remodel stalls once demolition reaches the subfloor.

Bathrooms add walls and ceilings to the testing list. Textured ceiling finishes, joint compound on drywall seams and old plaster behind tile can all hold asbestos, and pipes under a sink sometimes keep their original asbestos wrap. If the plan moves plumbing or opens a wall, those materials need asbestos testing too.

Black glue on the subfloor is a separate job from the tiles, and A&E Environmental’s asbestos mastic removal service strips that adhesive so the new floor goes down on a clean base.

Asbestos Testing Before a Sterling Basement or Attic Becomes Living Space

Owners finishing a cellar or attic are often asked on the first call what is already down there, and the answers usually point to materials that were never covered up. Unfinished spaces keep a house’s original asbestos pipe insulation, cement flues and floor tile in plain view, which makes them the likeliest places for asbestos testing to find something.

In the basement, look for wrapped heating pipes, an old flue, asbestos floor tile laid straight onto the concrete and scraps left from an earlier boiler swap. Some cellars also carry fiberboard panels or transite near the furnace.

Up under the roof, the material that matters most is loose vermiculite insulation, which looks like small grey-brown pebbles and can contain asbestos depending on where it was mined, so nobody should walk through it, move it or vacuum it before the testing results come back.

Framing, wiring and insulating go straight over these surfaces, which means asbestos testing has to happen before the first stud goes up.

Vermiculite that tests positive for asbestos needs a full clean-out before the attic can be insulated again, which A&E Environmental’s asbestos vermiculite removal service handles under containment.

Asbestos Testing on Roof Shingles, Cement Siding and Old Window Putty

“The outside is just shingles, so it is fine, right?” Not necessarily. Many older houses were clad in asbestos cement siding shingles at some point, and older roofing, roofing felt and flashing compounds can contain asbestos as well. They are stable while intact, but removal means breaking, prying and cutting, which is exactly what releases asbestos fibres, so exterior asbestos testing comes first.

Farm buildings deserve a mention here. Barns, sheds and outbuildings on older Sterling properties were often patched with whatever durable sheet material was available, and cement panels on a barn wall or roof need asbestos testing before anyone takes a saw to them.

Windows are easy to forget. Some older glazing putty and caulking contained asbestos, so a window replacement should include testing of the putty and the caulk around each frame alongside any siding testing.

Asbestos cement shingles that test positive can come off in one planned stage through A&E Environmental’s asbestos siding removal service, before the new cladding arrives.

Asbestos Testing and the Health Questions Families Ask First

Parents and adult children caring for an older relative usually ask whether the house is safe to live in right now. The short answer is that intact asbestos left alone is not the main risk, because danger comes from disturbance, when an asbestos material is broken, sanded or cut and the fibres drift through the rooms and settle into dust, carpets and ductwork.

Breathing asbestos fibres is linked to mesothelioma, lung cancer and asbestosis, and illness typically appears decades after the exposure, which is why nobody can tell at the time whether a dusty weekend project did harm. That delay is the strongest argument for asbestos testing before work starts rather than after.

Your hired trades benefit from the testing as well. A plumber cutting into untested asbestos pipe wrap is exposed along with your household, and most careful trades will ask whether asbestos testing has been done before they quote.

Where an earlier project has already disturbed asbestos and left debris behind, A&E Environmental’s asbestos remediation service cleans up the affected area so the household can use it again.

Asbestos Testing From a Licensed Sterling Survey Versus a Hardware-Store Kit

“Can I just buy a kit at the hardware store?” is a fair question, and the honest answer is that a kit may satisfy curiosity about one tile but does not meet the state requirement. Massachusetts expects asbestos testing to be carried out by an asbestos inspector licensed by the Department of Labor Standards, with samples analysed by a licensed asbestos testing lab.

How the sample is taken matters as much as the lab. Prying a chip from a ceiling or pipe wrap with household tools can release the asbestos fibres you are trying to avoid, and one sample says nothing about the other materials in the room. A licensed inspector decides which materials need asbestos testing, samples each one in a way that limits disturbance and documents it so the testing report holds up when the building department or an abatement contractor reads it.

Before testing starts, ask the asbestos inspector for a Department of Labor Standards license number. Anyone doing the testing properly will expect the question.

A textured ceiling that comes back positive can be scraped down safely under containment through A&E Environmental’s popcorn ceiling removal service, leaving it ready to refinish.

Asbestos Testing Price Factors Sterling Callers Want Explained

“What will asbestos testing cost?” usually comes within the first minute of a call, and there is no fair single number to give over the phone. The cost follows the number of distinct materials in the work area, because each one is sampled and analysed separately, so a single bathroom floor is a small testing job and a whole-house renovation is a larger one.

Access is the second testing factor. A cleared cellar, an attic hatch that opens easily and a boiler room you can walk into all shorten the asbestos testing visit, while crawl spaces, sealed soffits and locked outbuildings take longer.

Lab turnaround is the third testing factor. Standard asbestos testing turnaround suits a project still in planning, while faster results are usually available if you are working to a closing date or a contractor’s start date.

The way to keep the testing total down is to describe the whole project on the first call, since testing the kitchen now and the bathroom next spring means two visits where one would have done.

Flooring is a frequent asbestos finding in older houses, so A&E Environmental can quote its asbestos flooring removal service alongside the testing and show you the full picture before you commit.

Asbestos Testing Results, the Lab Report and the One Percent Line

Once samples are taken, the next question is how to read the asbestos testing results. The lab analyses bulk building materials by polarized light microscopy, and anything containing more than one percent asbestos is classed as asbestos-containing, while a “none detected” testing result means that material can be handled like any other part of the job.

Finding asbestos changes the plan, not the safety of the house today. If the project will disturb the material, a licensed asbestos abatement contractor files an AQ 04 notification with MassDEP and the Department of Labor Standards, pays the $100 fee, lists the start and end dates and then waits ten working days before removal begins. Sterling falls under the MassDEP Central Region office, one of the regional offices alongside Northeast, Southeast, Western and Boston.

Booking asbestos testing while drawings and quotes are still in progress lets that waiting period pass quietly in the background. Booked after the contractor is on site, the same ten days become ten days of idle crew.

Only the material that tested positive needs to go, so the asbestos removal that follows is usually limited to it while the rest of the project carries on as planned.

In Focus

The Sterling Center Historic District was added to the National Register of Historic Places in 1988, taking in the central village roughly bounded by Meetinghouse Hill and Main, Maple, Kendall Hill, Boulding, Worcester and Princeton Streets. Its focal point is the town common, laid out in 1724 when the area was still part of Lancaster, and the town notes that a statue commemorating Mary Sawyer’s lamb stands there. Mary Sawyer, whose pet lamb inspired “Mary Had a Little Lamb,” was born in Sterling in 1806.

The 1835 Town Hall on the common shows why age alone is a poor guide to asbestos. The town records that a major renovation in the 1970s repaired structural problems, updated bathrooms and installed drop ceilings, so an 1830s building can carry 1970s finishes inside. Owners of 18th and 19th century houses in the district should expect the same pattern, with original plaster and slate alongside later ceiling tiles, sheet flooring and boiler insulation, and plan their asbestos testing around both.

Owners of older houses around the common can find background on asbestos materials and their health effects before arranging a survey.

Asbestos Testing When a Ceiling or Floor Is Already Open

“We already started, so what now?” is a call that happens more often than people think. A contractor has pulled up a kitchen floor, or a pipe has burst and brought down a ceiling, and the owner wants to know what to do next. The right first move is to halt work in the room, keep people and pets out and leave the debris unswept and unvacuumed.

Asbestos testing at that point answers two questions together. It tells you whether the disturbed material contained asbestos, and it identifies the other asbestos suspects in the work area before anything more is opened. MassDEP has an emergency waiver process for situations where the usual ten-working-day notice cannot be met, which a licensed asbestos contractor can apply for.

Asbestos testing late in a job still has value, even if it costs more than testing would have before the first tile came up.

For sudden situations like a collapsed ceiling, A&E Environmental’s 24/7 response line is there to arrange the next step quickly.

Asbestos Testing for Sterling Buyers, Sellers and Landlords

Buyers are often asked by their agent whether the home inspection checks for asbestos, and it usually does not. A standard home inspection is visual and does not normally include sampling, so a buyer planning to renovate soon after closing can arrange asbestos testing during the inspection period and learn what the work will really involve before signing.

Sellers ask whether an asbestos testing report will help or hurt. In most cases a recent report showing which materials were tested, which were clear and which were removed answers a buyer’s concerns before they become negotiating points, especially on an older farmhouse or a house in the historic centre.

Landlords and condominium associations do not fall under the owner-occupant exception, so renovation between tenants needs asbestos testing first. Building the testing into the turnover schedule, rather than waiting until a floor is already up, keeps a unit from sitting empty longer than it has to.

Where a burst pipe in a rental has exposed old asbestos pipe insulation and an insurance claim is open, A&E Environmental offers direct insurance billing, so testing and any removal can be billed to the insurer directly.

Asbestos Testing for Sterling Farms, Commercial Buildings and Multi-Unit Property

Business owners ask on the first call whether commercial buildings follow the same asbestos rules as houses, and they do, on a larger scale. The town notes that Sterling’s agricultural lands are giving way to residential and industrial development, so commercial asbestos testing here ranges from older barns being converted to new uses through to light industrial units, offices and small retail blocks.

Older commercial buildings tend to hold asbestos in ceiling tiles, floor tiles, mechanical-room pipe insulation, roofing and fireproofing. Occupied buildings usually go through testing in phases, starting with empty areas, so tenants and staff keep working while each section is cleared.

For the town’s schools, the Asbestos Hazard Emergency Response Act adds a federal duty, requiring them to inspect for asbestos and keep a management plan. Demolition of any commercial structure needs a full pre-demolition asbestos survey, and that testing should be finished well before the demolition contractor is booked.

Larger buildings need removal phased around the people using them, and A&E Environmental’s commercial asbestos abatement service is planned for offices, retail space, farm buildings and multi-unit properties.

Asbestos Testing That Clears a Sterling Work Area After Removal

“How will I know it is safe to go back in?” is the question most owners ask once asbestos removal is booked. The work area is inspected to confirm the asbestos is gone, and larger projects usually finish with clearance air testing inside the containment before the plastic sheeting comes down.

That independent check usually comes from a licensed asbestos project monitor who is not part of the removal crew, and the space is handed back only once the clearance testing passes.

For projects that call for full containment and clearance testing at the end, A&E Environmental’s asbestos abatement service is set up to work alongside that independent sign-off.

Asbestos Testing Reports Sterling Owners Should Keep for the Next Project

Owners sometimes ask whether to hold on to the paperwork once a job is done. Keep all of it, because the original asbestos testing report, the removal records and the clearance testing result together form a record of what was found, where and what happened to it.

That record pays off later. The next contractor can see at a glance which materials tested clear and which were removed, a buyer gets straight answers and a future renovation only needs asbestos testing on materials the earlier survey did not reach.

An older asbestos testing report still counts for the materials and rooms it included, so a well-kept file can trim the scope of the next round of testing rather than starting from nothing.

Owners moving from testing to a careful strip-out of old finishes can use A&E Environmental’s dust-controlled interior demolition service, which keeps the dust contained as walls and ceilings come down.

Asbestos Testing Questions From First-Time Sterling Callers

Do I need asbestos testing if my house was built in the 1980s?
Yes, if the project will disturb building materials. Massachusetts requires an asbestos survey before renovation or demolition whatever the age of the building, and asbestos materials were still in use in houses from that era.

How long does the testing visit take?
For a typical house, testing takes a few hours, depending on how many different materials are in the work area and how easy the cellar and attic are to reach.

Can we stay at home during asbestos testing?
In most cases, yes. The inspector removes small pieces of each material and seals each sample and the spot it came from, so most households carry on as normal.

Will testing leave marks?
Only small ones. Samples usually come from discreet places such as inside a closet or under a threshold, and each spot is sealed afterwards.

My old barn has cement panels. Should they be tested?
Yes, before anyone cuts, drills or removes them, since cement sheet panels on older farm buildings are a common suspect asbestos material.

Who receives the testing report?
You do. Your contractor needs it to plan the work, the building department may ask for it with your permit application and it belongs in your house records afterwards.

How soon can work start after the results?
If no asbestos is found, straight away. If asbestos is found and will be disturbed, removal follows the ten-working-day MassDEP notice period first.

If the questions point toward an old basement floor, A&E Environmental’s asbestos tile removal service can be planned as soon as the testing results arrive.

Asbestos Testing Paperwork for PermitLink and the Butterick Municipal Building

Callers often ask where the asbestos testing report goes once they have it. In Sterling, building, demolition and renovation permits run through the Building Department, which the town describes as enforcing the State Building, Electrical, Plumbing and Gas codes and the Protective (Zoning) Bylaws. The town has moved to electronic permitting through PermitLink and asks for all permits to be submitted electronically, so a digital copy of your testing report is the easiest format to attach.

Building Department, Butterick Municipal Building
1 Park Street, Sterling, MA 01564
978-422-8111, ext. 2301

The Butterick Municipal Building, once an elementary school, sits on the north side of the town common and now serves as the Sterling Town Hall. The town lists the Building Department’s hours as Monday through Thursday, with the office closed on Fridays, so plan permit questions around that.

Asbestos-wrapped heating lines turn up often in older cellars, and A&E Environmental’s asbestos pipe wrap removal service can be scheduled to fit the permit timeline.

Asbestos Testing in Sterling MA Arranged From the First Call

Every project in town, from a farmhouse near the Stillwater River to a 1980s colonial or an older house on the common, goes more smoothly when asbestos testing happens before the design is finished rather than after demolition has begun.

For asbestos testing in Sterling MA, as well as in Clinton and West Boylston next door, A&E Environmental is a phone call away, with financing for larger projects that move on to asbestos removal. Call (978) 466-1333 to talk through your project and book asbestos testing.

We Also Provide Commercial Asbestos Abatement Services

Commercial asbestos repair, mold removal, and removal services for businesses, schools, non-profits and government agencies

Hotels

Restaurants

Resorts

Schools

Office Buildings

Retail Stores

Nursing Homes

Municipal, State, Federal Buildings

Apartment Complexes

Condominiums

Industrial Manufacturing

Churches

Trust Your Home to the Best in the Business

When you need environmental services for your property, it can be a stressful time. Adding to this anxiety is the thought of having strangers in and out to complete the work. A&E Environmental cares about our reputation and our customers, and for this reason, has partnered with The Seal.

Our relationship with The Seal allows us to complete 3rd party-verified employee background screening and identification services. You’ll never have to question the integrity of the technicians working in your home, because we have already verified their licensing, insurance, and criminal background.

Why A&E Environmental?

24/7 Emergency Services Available

24/7 emergency response for disaster events. When tragedy strikes, count on us for certified asbestos and mold damage repair and restoration.

Direct Insurance Billing

A&E Environmental will help you understand what you are entitled to under your policy coverage and submit all invoices directly to your insurance company for payment so you don’t have to deal with one more thing during trying times

Financing Available

Disasters can strike at the most inopportune of times, with financing available you can minimize the financial disruption to your family or business and concentrate on putting the event behind you and getting life back to normal

Understanding Damage Restoration Services

Sometimes it’s confusing trying to understand whether you need a cleanup, repair, mitigation, remediaiton or restoration services company in Massachusetts. let us explain some of the services to better help.

Mold Removal and Remediation for Your MA Home Or Business

So which is it? Mold removal or mold remediation, or mold abatement? Often these terms like many in the restoration industry are commonly interchanged when they actually mean different things. Mold removal is the act of removing the mold from the property or area so that the presence of mold no longer exists above normal, natural levels. Mold remediation is the process of creating and implementing a mold abatement plan that will actually address the underlying reason the excessive mold was able to proliferate and become a health risk. Remediation by definition includes the mold removal, and abatement process.

A&E Environmental is committed to ensuring the safety and well-being of businesses across Massachusetts and New Hampshire through our expert commercial asbestos abatement services. We understand the inherent health risks that asbestos in commercial properties can pose to employees and visitors alike.

Learn More About Our Other Services

MOLD REMOVAL & REMEDIATION

Providing Residential & Commercial Mold Services

Our services encompass a range of critical tasks, including mold inspection, testing, and remediation. Whether it’s a household seeking a healthier indoor environment or a business aiming to maintain a safe and clean workspace, professionals in this field are equipped to assess the extent of mold problems, implement effective removal strategies, and take preventive measures to ensure long-term mold control, safeguarding the well-being of occupants and preserving property integrity.

CLIENT TESTIMONIAL

HONEST BUSINESS PRACTICES

“A&E Environmental exceeded my expectations. In a day and time when few businesses return your call, never mind arrive on time and complete the work in the timeframe quoted, A&E did that and more. When they finished the work, I asked many questions, all of which were answered in detail and by walking around our home showing me exactly what they did. From the front office staff to the actual workers, all were respectful, timely and did exactly what they said they’d do! Kudos to the entire company.”

Paulina

HOARDING AND BOARDING

Property Cleanup and Security

Whether you are faced with a hoarding, or a boarding situation, A&E Environmental can help. Prompt cleanup and boarding services for any situation

CLIENT TESTIMONIAL

EXTREME INTEGRITY

“I hired A & E Environmental to remove asbestos that lined old steam pipes and boiler in my basement. The work was done quickly and safely. The area with asbestos was completed sealed off and venting was used during the work. The old, massive, steam boiler need to be removed as part of the project and that was hauled off. The team from A & E Environmental were friendly and got the job done in less than a day. Excellent service, highly recommend using them!”

Joe

Let A&E Environmental Help Guide You Through The Complex Process Of Your Insurance Claim Submittal.

We Work With All Insurance